Solar Commissioning Checklist: What to Photograph Before Handover
Every installer has a version of the same story. A customer calls eighteen months after handover about a fault, a nest, a loose cable or a cracked tile, and the conversation turns on one question: what did the roof look like on the day you left it? If the answer lives in one person's memory and a handful of phone snapshots nobody can find, the installer is arguing from a weak position. If the answer is a dated set of photographs filed with the commissioning documents, the con